What not having an AV consultant can cost!Here is an example of what designing a project without an audio visual consultant can cost.Use this matrix and substitute one of the three scenarios in the blank. AV Consultant was hired ____________ the Architect |
||
At the same time as |
After |
Difference |
Electrical requirements to support AV specified into job. ~ $5,000 |
Electrical change orders because conduits and circuts for AV system were not in the original bid (or in correct location). ~ $20,000 |
$15,000 |
Finish carpenter has exact demensions of countertops and cabinets for equipment. $0.00 |
Replacing already built countertops because the equipment will not fit $1,500.00 |
$1,500 |
Electrial company knows the AV systems must have its own isolated ground. $300.00 |
Electrial company core drills through concrete slab to provide isolated ground. $2,000.00 |
$1,700 |
Specifing air conditioning vent in amplifier room. ~ $500 |
Adding and extra run of AC because equipment is getting too hot. ~ $4,000 |
$3,500 |
AV Consultant & Architech work together to address acoustic problems. ~ $25,000 |
Acoustic paneling is the only resort, after construction is complete, to tame acoustic problems. ~ $75,000 |
$50,000 |
Proper placement of Amp Room. |
Have to move Amp Room because Architect located it under baptistry ~ $10,000 |
$10,000 |
Support systems were designed in the main structure for the speakers, lights, and projectors $3,000.00 |
Add steel support beams after the building is in the dry. $12,000.00 |
$9,000 |
* based on a recent 1,000 seat building. |
TOTAL DIFFERENCE: |
$90,700 |
Hiring your AV Consultant at the beginning of the project: |